A new case study has been added to our download section.
In Detroit Lakes, MN, a frequently trafficked diamond crossing operated by Canadian Pacific and BNSF had experienced frequent fouling because of mud-pumping. Mud pumping results in ballast failure, that weakens the track modulus, and consequentially reduces the bearing capacity.
The use of TrackTex is the most cost-effective way of preventing and correcting mud pumping failure.
Learn more about this project by downloading our case study here.