Diamond Crossing Replacement with TrackTex
A new case study has been added to our download section. In Detroit Lakes, MN, a frequently trafficked diamond crossing operated by Canadian Pacific and BNSF had experienced frequent fouling because of mud-pumping. Mud pumping results in ballast failure, that weakens the track modulus, and consequentially reduces the bearing capacity. The use of TrackTex is …