Trackbed Rehabilitation

In 2009 Network Rail decided that the up line through Bradley Junction was life expired and would not be able to carry the proposed increase in annual tonnage from 6 million to 11 million.

Project Information

Owner

Network Rail

Engineer

AECOM

Location

Contractor

Technical Description

Product: Tracktex & Large aperture Geogrid
10 Rolls
Dimensions: 82’ft x 12.7’ft

Share

Introduction

In 2009 Network Rail decided that the up line through Bradley Junction was life expired and would not be able to carry the proposed increase in annual tonnage from 6 million to 11 million.

An investigation undertaken in 2010 (AECOM, 2010) described the track bed as variable, with very dirty waterlogged ballast, and evidence of upwards migration of clay formation which had caused the track geometry to deteriorate rapidly. The installation of TrackTex Anti- pumping Geocomposite was selected by Network Rail as a method of preventing mud pumping a prolonging Trackbed performance.

In 2017 Netowork Rail commissioned AECOM to perform a detailed evaluation of the project; a series of test pits were excavated to determine the effectiveness of rehabilitation.

Details

AECOM were commissioned by Network Rail (NR), under a Framework contract (NTR457 Trackbed Investigation Site Works and Reporting) to perform trial holes at a single site in the London North East territory to assess geocomposite performance.

Five separate trial pits were dug along a 100-yard section of Track, two pits in a section prior to the installation of the geocomposite, and three pits where the TrackTex had been installed.

*No TrackTex was present at the proposed location of SP 1 & 2, which were advanced before the Tracktex section

At SP1, where TrackTex was not present, formation failure and wetbeds are evident, with clay and slurry present within the lower trackbed layers and bottom of the ballast layer.

At SP 2, where TrackTex was not present, wet cohesive fines were encountered on lower trackbed layers.

At SP 3, abundant coarse red sand was found to have become intermixed with the bottom of the ballast layer (from approximately 100mm below sleeper bottom). It was concluded that this had not been derived from beneath the geocomposite from the available information and may have migrated laterally.

At SP 4 & 5, the Tracktex appears to be performing well in preventing the migration of clay fines from beneath and preventing any significant loss in the residual life of the ballast.

Close up of SP1 shows that where no Tracktex is present, formation failure is evident.

Close up of SP5 shows that where Tracktex is present, the composite is performing well and has prevented migration of the clay fines.

Latest

Discover Our Case Studies

Explore our latest case studies showcasing our expertise.

Chicago Transit Authority Blue Line

The CTA Blue Line upgrades in 2023 presented some challenging ground conditions in a tight, urban setting. A solution was needed to deal with low CBR subgrade while keeping to shallow construction ...

Diamond Crossing Replacement with TrackTex

In Detroit Lakes, MN, a frequently trafficked diamond crossing operated by Canadian Pacific and BNSF had experienced frequent fouling because of mud-pumping. Mud pumping results in ballast failure,...

Coos Bay Line Tunnel 21 Rehabilitation

The Coos Bay Rail Line is owned and operated by the Port of Coos Bay. It spans 134 miles from Coquille Oregon to Eugene Oregon, providing connections to the North American rail network for manufact...
Preventing Mud Pumping, Ensuring Track Stability

Comprehensive Services for Track Stability and Performance

At TrackTex, we offer a range of services designed to address the challenges of mud pumping and ensure the stability and performance of your tracks. Our team of experts utilizes advanced techniques and technologies to deliver effective solutions tailored to your specific

Professional Development Hours

GEOfabrics continuing education sessions provide technical training on specifying and using TrackTex. These sessions contribute to PDH hours.

Trackbed Stabilization

Geosynthetics are widely used as a way to improve ballast performance under railways. GEOFabrics RK4 is a geocomposite comprising a stabilizing geogrid bonded to our RK1 needlepunched non-woven sep...

Symptoms of Mud Pumping

The symptoms of Mud Pumping are similar to those of life expired ballast, i.e. wet spots appearing at the surface of the ballast accompanied by rapid deteriorating of track geometry. However, from ...