Diamond Crossing Replacement with TrackTex

Detroit Lakes MN

Project Information

Owner

Canadian Pacific

Engineer

Thomas Larsen

Location

Detroit Lakes MN

Contractor

CP & BNSF

Technical Description

Product: TrackTex (82ft x 12.8ft) & Geofabrics

Share

 

How TrackTex Helped

TrackTex was installed on a cold October morning beneath the ballast as long-term effective remedy to this problem. TrackTex is a unique patented geocomposite and the result of over a decade of research by trackbed engineers and materials scientists.

Its specialist filter system improves trackbed quality over time and has been proven to significantly increase maintenance intervals. The use of TrackTex is the most cost-effective way of preventing and correcting mud pumping failure. Rainwater is unable to penetrate the microporous filter and is drained laterally to the side of the track Porewater below TrackTex is relived upwards under cyclic loading which aids residual slurry to dry out as the pore water is dissipated.

TrackTex conforms to the surface depressions in the formation layer and prevents the creation of slurry pockets. Fast installation rates reduce the construction costs and possession time.

 

 

What we did

On this project the use of a geogrid above the geocomposite was incorporated to provide additional stability. TrackTex can be used in conjunction with a geogrid and on this occasion a large aperture 30kN geogrid was placed above the composite prior to placing new ballast.

TrackTex was installed without the need for any specialist equipment.

On this installation a section of track was removed prior to installation however this is not always required. In most cases the track is simply lifted while the TrackTex is pulled into place.

 

Proven Performance

TrackTex has been proven to extend maintenance intervals by more than 25 times over conventional
geotextiles, it is for this reason that it is being increasing specified and installed.

 

Latest

Discover Our Case Studies

Explore our latest case studies showcasing our expertise.

Coos Bay Line Tunnel 21 Rehabilitation

The Coos Bay Rail Line is owned and operated by the Port of Coos Bay. It spans 134 miles from Coquille Oregon to Eugene Oregon, providing connections to the North American rail network for manufact...

Crossing Repair and Replacement using TrackTex

This road crossing had been replaced and repaired multiple times due to issues with track geometry movement and differential settlement of the highway and railroad. Union Pacific Engineers assessed...

Spaulding Avenue Crossing Rehabilitation

Chicago Transit Authority is responsible for a large number of road/rail crossings across its network. This rehabilitation project aimed to improve a crossing where track geometry was affected by...
Preventing Mud Pumping, Ensuring Track Stability

Comprehensive Services for Track Stability and Performance

At TrackTex, we offer a range of services designed to address the challenges of mud pumping and ensure the stability and performance of your tracks. Our team of experts utilizes advanced techniques and technologies to deliver effective solutions tailored to your specific

Professional Development Hours

GEOfabrics continuing education sessions provide technical training on specifying and using TrackTex. These sessions contribute to PDH hours.

Trackbed Stabilization

Geosynthetics are widely used as a way to improve ballast performance under railways. GEOFabrics RK4 is a geocomposite comprising a stabilizing geogrid bonded to our RK1 needlepunched non-woven sep...

Symptoms of Mud Pumping

The symptoms of Mud Pumping are similar to those of life expired ballast, i.e. wet spots appearing at the surface of the ballast accompanied by rapid deteriorating of track geometry. However, from ...